Integrating with the engineering geology condition,it analyzes the diaphragm wall construction difficulties,proposes corresponding solutions and makers specific illustration including diversion wall construction points,concrete anti-flowing measures,and d%结合某工程地质条件,针对其地连墙施工难点进行了分析,在此基础上提出了相应的解决措施并分别作了具体阐述,包括导墙施工要点,混凝土防绕流措施,地连墙接缝防渗措施等,以期指导今后同类工程施工。
展开▼