首页> 中文期刊> 《价值工程》 >关于桥梁施工中顶推施工技术要点的思考

关于桥梁施工中顶推施工技术要点的思考

         

摘要

The jacking construction technology is originated from the early steel bridge drag method and the longitudinal connection drag method. It mainly uses jack to replace the traditional pulley group, using the pulley block plate sliding device to replace the drum, to greatly improve the bridge construction technology efficiency and quality. This paper will focus on the basic principles, characteristics and main forms of this technology, and introduces some technical points of this technology in real bridge construction. Finally, it briefly discusses its application in practical engineering.%顶推施工技术起源于早期的钢桥拖拉法及纵向连接拖拉法.它主要用到了千斤顶来代替传统的卷烟机滑车组,利用滑车组的板式滑动装置来代替滚筒,对桥梁施工技术效率与质量加以大幅度提升.本文将围绕该技术具体探讨的基本原理、特征与主要形式,并介绍了该技术在真正桥梁施工中的一些技术要点,最后简要探讨它在实际工程中的应用.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号