水电工程施工的特殊性决定了极易出现工期延误现象,为了抢回被延误的工期,往往需要采取一系列赶工措施,从而引起承包商赶工费的索赔。本文分析了水电工程赶工费的一般构成,并对每项费用给出了计算方法,尤其对人工补偿费及机械补偿费提出了典型单价计算法,为合理确定赶工费提供应用参考。%Acceleration measures often appear during hydropower project construction for construction delay. This paper provides calculation methods of cost for acceleration measures on the basis of analyzing the composition. The typical unit price calculation method presented in the paper for labour and machinery cost will provide reference for rational determination cost for acceleration measures.