首页> 中文期刊> 《价值工程》 >蒋庄煤矿综放工作面供电方案的研究与实践

蒋庄煤矿综放工作面供电方案的研究与实践

         

摘要

The 3 下610 working face of Jiangzhuang coal mine is the first fully mechanized caving face with high equipment power, and long distance power supply and full mechanized face equipment are used for the first time. According to the complicated conditions of power supply system, the power solutions are put forward from multiple aspects to solve the difficulties in the power supply system, which ensures the normal operation of full mechanized face equipment, and provides reference for the next installing power supply design of the working face.%蒋庄煤矿3下610工作面为矿井首个综放工作面,设备功率大、供电距离远、综机设备均属首次应用,针对供电系统的复杂情况因地制宜地提出了该供电方案,从多个方面入手解决工作面供电系统中的难点,保证了工作面综机设备的正常运转,为下一步的工作面安装供电设计提供了参考和借鉴。

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号