针对郁62采区轨道下山大倾角、下山施工循环进度低的问题,制定合理的施工组织方案,解决了岩巷大倾角、下山施工循环进度低的难题。%For the low cycle progress problem of IV 62 mining area track downhill large inclination and downhill construction, this paper formulated a reasonable construction organization plan to solve this problem.