本文论述了750kV同塔双回路钢管塔组立的施工方案及抱杆系统受力计算方法,总结了“吊车+常规抱杆”组立钢管塔的施工方案.%This paper discusses the construction program of 750kV tower double loop steel tower assembly and the force calculation method of lock rod system, and sums up the construction program of "crane and conventional lock rod" assembly steel pipe tower.