首页> 中文期刊> 《价值工程》 >改变采区联合布置方式提高矿井资源回收率

改变采区联合布置方式提高矿井资源回收率

         

摘要

新铁煤矿将原有9个生产采区缩减到5个,将原来部分采区合并进行联合布置,解放采区隔离煤柱,重新优化设计利用-350米二水平回风大巷兼做一水平-350米以上运输巷,进而减少主运巷压煤,同时解决高吊煤回收,使得原有呆滞煤量得到了合理开发利用,采用先进采煤方法大大提高了矿井回收率.%The new iron mines reduced the original mining area from 9 to 5 and merged and combined arrangement of the original part mine, the liberation of coal pillar mining area, re-optimize the design using the second level of -350 meters of roadway air return cater to a level of -350 meters above the roadway, thereby reducing pressure lane main transport of coal, while addressing the high-hanging coal recovery, making the original amount of sluggish coal get rational development and utilization, the use of advanced mining method greatly improves the recovery of the mine.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号