The offshore booster station is the key link of power transmission in offshore wind farm.All the equipments of its upper block are assembled in the base.In base hoisting,water transport and sea hoisting,the inclination and vibration may cause some impacts on electrical equipments of offshore booster station,or even damage.Based on the construction monitoring of upper block in coastal offshore booster station in Jiangsu Province,the variation law of inclination and vibration are studied.The monitoring results show that the inclination and vibration during construction period is small,which meet design requirements.The monitoring provides relevant measurement parameters for the design and construction of offshore booster station.%海上升压站是海上风电场电能传输的关键环节.升压站上部组块所有设备在基地组装完毕,在基地吊装、水上运输、海上吊装的施工期中,出现倾斜和振动可能会对电气设备造成一定影响,甚至损坏.基于江苏滨海海上升压站上部组块的施工期监测,研究其倾斜和振动变化规律.监测结果表明,该结构施工期倾斜和振动不大,均满足设计要求,为设计和施工提供相关实测参数.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号