结合码头结构形式,采用粘贴钢板加固法对码头轨道梁进行加固,提高码头轨道梁承载力,使轨道梁能满足新门机的荷载使用要求。介绍了粘贴钢板加固法的工艺流程及对加固前后轨道梁承载力进行了对比分析。%In combination with the wharf structure form,the pasting steel plate reinforced method is adopted for track beams reinforcement to improve the bearing capacity of track beam.The track beam can satisfy the requirement of the new gantry crane load using.In this paper,the technological process of the pasting steel plate reinforced method were introduced and track beam bearing capacity before and after the reinforcement were analyzed in comparison.
展开▼