首页> 中文期刊> 《云南水力发电》 >滇中引水工程董家村渡槽跨河断面洪水分析

滇中引水工程董家村渡槽跨河断面洪水分析

         

摘要

云南省滇中引水工程大理Ⅱ段输水线路中的董家村渡槽跨河断面上游建有普淜、邵家两座梯级中型水库,根据现有资料条件,为推求董家村渡槽跨河断面的设计洪水,按逐级同频率考虑,沿河道自上而下拟定4个分区的不同洪水地区组成方案,进行方案分析比较,从安全角度出发,以最不利于工程安全的情形考虑,优选方案,最终推求得到董家村渡槽跨河断面的设计洪水。%There are two cascade medium-sized water reservoirs called Pupeng and Shaojia respectively upstream of the Dali section II water conveyance line Dongjiacun aqueduct across a river of the water diversion works in central Yunnan province. According to the data now available 4 sub-regions with different lfood regimes were selected based on the same frequency along the river channel from upstream to downstream in order to reckon the design lfood at the cross-section of the Dongjiacun aqueduct across the river. As viewed from safety the design lfood at the cross-section of the Dongjiacun aqueduct across the river was considered optimal and selected after making comparison taking into consideration the worst inlfuence on the project.

著录项

相似文献

  • 中文文献
  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号