The storage pool of Shiping County Effl uent Plant(Mabaolong) is an underground fully buried pool with a high underground water level and thefl oatation calculation should be taken into account under the condition of safe structure in its design. The pool is of a complex structure composed of walls, plates, beams and columns and its structural calculation was completed mainly with the STRATfi nite element software with the aid of pkpm.%石屏县污水处理厂(马宝龙)调蓄池为地下全埋式水池,地下水位较高,在考虑结构安全情况下还应考虑抗浮计算。水池为墙、板、梁、柱结构,结构较复杂,主要采用佳构(strat)有限元软件进行计算,还需pkpm作为辅助计算完成。
展开▼