The paper gives an introduction to the design of the power intake structure layout of the Ten-glongqiao -II hydropower project .The intake is placed in the gravity dam body section and connected with the powerhouse through the embedded pipe in the dam .The integration of the dam ,the power tunnel and the powerhouse in the layout reduces the use area of land ,saves investment and facilitates the management of both the dam and the powerhouse in operation .%介绍腾龙桥二级水电站进水口结构布置设计,进水口布置于重力坝坝身段,通过坝内埋管后接厂房。将大坝、发电引水及厂房结合为一体,减少工程占地范围,节约投资,方便运行中的大坝、厂房管理。
展开▼