On-load measurement method for the reliability of distribution transformers

机译:配电变压器可靠性的负载测量方法

代理获取
本网站仅为用户提供外文OA文献查询和代理获取服务,本网站没有原文。下单后我们将采用程序或人工为您竭诚获取高质量的原文,但由于OA文献来源多样且变更频繁,仍可能出现获取不到、文献不完整或与标题不符等情况,如果获取不到我们将提供退款服务。请知悉。

摘要

Transformer is the most important equipment used in power system. It's ensure network stability and reliability. Transformer fails over time due to several factors such as overload, poor insulation, cellulose deterioration, poor dielectric strength of the oil etc. However, transformer owners are finding it difficult to monitor the performance of distribution transformers (DT) in their place of application which results to system failure. Analyses of this distribution transformer performance required that distribution transformer be put on-load and the secondary terminals link to Power Quality and Energy Analyzer equipment (Fluke 435 Series II). This paper presents a methodology of carrying out experimental set up of on-load reliability measurements of the two distribution transformers, 500 kVA and 300 kVA, 11/0.415 kV as case study. Recommendations for the operations and maintenance engineers in charge to comply are discussed. This approach using the prescribed power quality equipment gives a reliable experimental method of evaluating the performance of distribution transformers.
机译:变压器是电力系统中最重要的设备。它确保了网络稳定性和可靠性。由于多载,绝缘,纤维素劣化,油等差的几个因素,变压器等因素随着时间的推移而失败。然而,变压器业主发现难以监测分配变压器(DT)的性能在其应用位置结果系统故障。该分配变压器性能的分析要求将配电变压器放在负载和辅助端子链接到电力质量和能源分析仪设备(Fluke 435系列)。本文介绍了两种分配变压器,500 kVA和300 kVA,11 / 0.415kV的载有货可靠性测量的实验组的方法。讨论了符合符合要求的运营和维护工程师的建议。这种方法采用规定的电力质量设备提供了一种评估分配变压器性能的可靠实验方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
代理获取

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号