...
【24h】

Voyager Delayed

机译:旅行者延迟

获取原文
获取原文并翻译 | 示例
           

摘要

Delivery of the Airbus Military A330-200 Voyager tanker-transport to the Royal Air Force has been delayed. The aircraft was originally due to arrive for service at RAF Brize Norton, Oxfordshire, in October 2011, but the first example landed at the base on December 22. However, technical issues have resulted in delivery being delayed. In a statement to parliament on January 10 Peter Luff, Minister for Defence Equipment, Support and Technology, stated that the delays has been caused by technical issues, including hose pipe stability and fuel leaks. They were discovered during refuelling trials with the Tornado GR4.
机译:空客军用A330-200航海家号油轮运输机向皇家空军的交付已延迟。该飞机原定于2011年10月到达英国皇家空军的牛津布赖兹·诺顿(Brize Norton)服役,但第一个飞机于12月22日降落在基地。然而,技术问题导致交货延迟。国防设备,支持和技术部长彼得·拉夫(Peter Luff)在1月10日向议会发表的声明中说,延误是由技术问题引起的,包括软管的稳定性和燃油泄漏。它们是在Tornado GR4的加油试验中被发现的。

著录项

  • 来源
    《Air International》 |2012年第2期|p.8|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号