...
首页> 外文期刊>Annals of Operations Research >Correction to: Short-term manpower planning for MRT carriage maintenance under mixed deterministic and stochastic demands
【24h】

Correction to: Short-term manpower planning for MRT carriage maintenance under mixed deterministic and stochastic demands

机译:更正为:确定性和随机性混合需求下的捷运车厢维护的短期人力规划

获取原文
获取原文并翻译 | 示例
           

摘要

In the original article (Chen et al. 2010), the authors inadvertently did not reference their previous work to which this article (Chen et al. 2010) is related. The reference list has been updated with the addition of Chen et al. (2008) to reflect this. The authors apologize for any inconvenience they might have caused.
机译:在原始文章(Chen等,2010)中,作者无意中没有引用与本文(Chen等,2010)相关的先前工作。参考清单已通过添加Chen等人进行了更新。 (2008年)反映这一点。对于由此给您带来的不便,作者深表歉意。

著录项

  • 来源
    《Annals of Operations Research》 |2018年第2期|543-543|共1页
  • 作者单位

    Department of Logistics Management, Shu-Te University;

    Department of Civil Engineering, National Central University;

    Department of Finance, National United University;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号