...
【24h】

Kick Stage

机译:踢台

获取原文
获取原文并翻译 | 示例
           

摘要

Tight budgets and a tight schedule mean NASA will use an existing upper stage for the first two tests of its Space Launch System (SLS) human-exploration rocket, instead of flying the Orion multi-purpose crew vehicle (MPCV) with the human-rated J-2X engine already in full-scale ground test. Engineers developing the heavy-lift SLS are polling the worldwide launch industry in search of an upper stage they can use to kick the Orion MPCV on two test flights around the Moon. Under pressure from Congress to build and fly the big new rocket quickly, the U.S. space agency has scheduled an unmanned lunar flyby late in 2017, followed by a lunar-orbital mission with a four-person crew in 2021.
机译:紧张的预算和紧迫的时间表意味着NASA将使用现有的上层级进行太空发射系统(SLS)人体探测火箭的前两次测试,而不是使用带有人工额定值的Orion多用途乘员车(MPCV)进行飞行J-2X发动机已经在全面地面测试中。开发重型SLS的工程师正在对全球发射业进行调查,以寻找可用于在绕月球的两次试飞中对Orion MPCV进行踢射的阶段。在国会的压力下,美国迅速要求建造和飞行大型新火箭,美国宇航局计划在2017年底进行无人驾驶月球飞行,然后在2021年进行一次载有四人的月球轨道飞行任务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号