The U.S. Air Force has a lot riding on the Transformational Satellite (TSAT) project during the coming months. Besides trying to ensure that future combatants have enough secure bandwidth to carry out their missions, the service is attempting to restore its reputation as a space program manager. A series of high-profile cost overruns and schedule delays has badly tarnished the Air Force's "street credentials" in Congress, leading to repeated and deep budget cuts. The "new" TSAT program—the development plan has been modified several times because of funding cuts—is as much about transforming the views of critics on the outside as it is about fielding a high-throughput satellite communication system starting in 2014.
机译:在接下来的几个月中,美国空军对“转换卫星”(TSAT)项目的投入很大。除了努力确保未来的战斗人员有足够的安全带宽来执行任务外,该部门还试图恢复其作为太空项目经理的声誉。一系列引人注目的成本超支和计划延误严重损害了空军在国会的“街道资格”,导致反复和大幅度削减预算。 “新的” TSAT计划(由于削减了资金而对开发计划进行了多次修改)与从2014年开始部署高通量卫星通信系统一样,不仅要改变外界的批评者的观点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号