首页> 外文期刊>Aviation Week & Space Technology >SLS Debut Looks Set To Slip Into 2021
【24h】

SLS Debut Looks Set To Slip Into 2021

机译:SLS首次亮相看起来陷入2021年

获取原文
获取原文并翻译 | 示例
           

摘要

Contractors for NASA's Space Launch System (SLS) heavy-lift rocket indicate the agency's decision to put the core stage through a "green run" full-scale ground test means first launch is more likely in 2021 as they enter a final phase of integrated structures, engines and systems testing. Although NASA is still officially targeting late 2020 for the SLS debut in the Artemis 1 test mission, the agency is widely expected to acknowledge the slide as part of the outcome of an ongoing review associated with recent leadership changes in its exploration programs. The green run, which will be held at NASA Stennis Space Center in Mississippi, is set for next year and could take place "in 6-9 months," said Robert Broeren, Boeing integrated product team lead for SLS stages.Speaking at the American Institute of Aeronautics and Astronautics' Propulsion and Energy Forum here, Broeren said that even though the company will complete core assembly in the coming weeks at the company's Michoud Assembly Facility (MAF) in New Orleans, there is still more work to do. "We have tests to verify the avionics, the cabling and [to] make sure everything talks to each other correctly," he said.
机译:NASA的空间发射系统(SLS)的承包商重型火箭指出了原子能机构通过“绿色运行”全尺寸地面测试将核心阶段的决定首次发射更有可能在2021年进入综合结构的最终阶段,发动机和系统测试。虽然美国宇航局仍然正式瞄准2020年代末期的SLS在Artemis 1测试任务中亮相,但该机构普遍预计将承认幻灯片,作为与其勘探计划中最近的领导变化相关的持续审查结果的一部分。绿色奔跑,将在密西西比州的美国宇航局斯伦蒂斯航天中心举行,在明年设立,并可在6-9个月内进行“6-9个月”,波音综合产品团队为SLS阶段领先。在美国阶段。在美国展示博罗伦斯的航空航天和航天会推进和能源论坛的推进与能源论坛表示,即使公司将在新奥尔良的公司MICHOD集会设施(MAF)在未来几周内完成核心大会,仍有更多的工作要做。 “我们有测试来验证航空电子设备,布线和[to]确保所有互相交谈,”他说。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号