Weba Chute Systems has won a contract from Isdemir Steel plant for three more custom-engineered transfer points, following on from the three earlier installations. In addition to overcoming the challenges of material degradation and excessive dust, the new chutes will be designed to address material segregation, screen presentation and screen efficiency, according to Alwin Nienaber, technical director at Weba Chute Systems.
展开▼