首页> 外文期刊>Civil Engineering Practice >Replacement of the Cranston Viaducts Using Spliced Bulb-Tee Girder Technology
【24h】

Replacement of the Cranston Viaducts Using Spliced Bulb-Tee Girder Technology

机译:使用拼接灯泡三通梁技术替代Cranston高架桥

获取原文
获取原文并翻译 | 示例
           

摘要

The application of bulb-tee girder technology provided economy and durability for this project, and its construction provided valuable experience. The Rhode Island Department of Transportation (RIDOT) retained an engineering firm in 1995 to perform environmental studies, preliminary engineering and final design for its Freight Rail Improvement Project (FRIP). This project is an undertaking by RIDOT, in conjunction with the Rhode Island Economic Development Corporation, to enhance the infrastructure within the state. These enhancements will enable the development of the Quonset Point/ Davisville Industrial Park as a major port container facility in the northeast United States.
机译:球座三通梁技术的应用为该项目提供了经济性和耐用性,其建造提供了宝贵的经验。罗德岛州运输局(RIDOT)于1995年保留了一家工程公司,以对其货运铁路改善项目(FRIP)进行环境研究,初步工程和最终设计。该项目是RIDOT与罗得岛经济发展公司(Rhode Island Economic Development Corporation)共同致力于改善州内基础设施的一项工作。这些改进将使Quonset Point / Davisville工业园成为美国东北部的主要港口集装箱设施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号