...
首页> 外文期刊>PCI journal >Spliced Bulb-Tee Girders Bring Strength and Grace to Pueblo's Main Street Viaduct
【24h】

Spliced Bulb-Tee Girders Bring Strength and Grace to Pueblo's Main Street Viaduct

机译:拼接灯泡形T形梁为Pueblo的主要街道高架桥带来力量和优雅

获取原文
           

摘要

align="left">The new $7.6 million Main Street Viaduct in Pueblo, Colorado, is a six-span precast prestressed concrete bulb-tee girder bridge, spliced together with post-tensioning. The overall length of the structure? is 807ft (246 m) with a maximum central span of 7 74 ft (53 m). There are eight girder lines with girders varying in depth from 72 in. (7 829 mm) at the ends to 96 in. (2438 mm) at the center, creating an attractive haunched effect. The project was constructed within the designated 7 2-month time frame and was under budget. This article discusses the design alternatives and structural design considerations. Production, transportation and erection of the precast concrete components are also highlighted.?
机译:align =“ left”>位于科罗拉多州普韦布洛的耗资760万美元的新大街高架桥是一座六跨度的预制预应力混凝土球泡三通梁桥,并与后张法拼接在一起。结构的总长度?是807英尺(246 m),最大中心跨度是7 74英尺(53 m)。有八条纵梁线,纵梁的深度从端部的72英寸(7 829毫米)到中心的96英寸(2438毫米)不等,从而产生了吸引人的弯曲效果。该项目是在指定的7个2个月的时间范围内建设的,并且在预算之内。本文讨论了设计替代方案和结构设计注意事项。还着重介绍了预制混凝土构件的生产,运输和安装。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号