Contractor notifications

机译:承包商通知

获取原文
获取原文并翻译 | 示例
           

摘要

DEEMING provisions as to events being accepted as a compensation event and quotations being deemed to have been accepted in the project manager's silence have been with us for over ten years since the launch of the New Engineering Contract third edition (NEC3). However, there is still a degree of uncertainty as to the timeframes in which the contractor should notify of the project manager's initial failure to respond in both scenarios. Linked to this, there is also a lack of clarity as to how many times the project manager may request a revised quotation for a compensation event prior to eventual acceptance.
机译:自发布新工程合同第三版(NEC3)以来,与DEEMING有关将事件作为补偿事件接受的规定以及被视为项目经理默默接受的报价有关的规定已经存在我们十多年了。但是,在两种方案中,承包商应告知项目经理最初未能做出响应的时间表仍然存在一定程度的不确定性。与此相关的是,在最终接受之前,项目经理可能会要求补偿事件要求修改报价的次数也不明确。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号