...
首页> 外文期刊>Civil Engineering >San Francisco Nears Start of Last Pipeline Improvement Project
【24h】

San Francisco Nears Start of Last Pipeline Improvement Project

机译:旧金山即将开始最后一个管道改进项目

获取原文
获取原文并翻译 | 示例
           

摘要

More than a decade ago, the San Francisco Public Utilities Commission (SFPUC) embarked on the $4.6-billion Water System Improvement Program, an ambitious undertaking designed to upgrade seismically vulnerable components of its water delivery system and ensure service for its 2.6 million customers in the event of a major earthquake. Comprising more than 80 infrastructure projects, the program is now more than 75 percent complete. As of mid-December the SFPUC was nearing another milestone as it prepared to open bids on the construction contract for the Peninsula Pipeline Seismic Upgrade, the last of 22 water pipeline improvement projects to be carried out as part of the Water System Improvement Program. Construction is expected to begin in April.
机译:十多年前,旧金山公用事业委员会(SFPUC)启动了一项耗资46亿美元的供水系统改善计划,这项雄心勃勃的工程旨在升级其输水系统中易受地震影响的组件,并确保为其260万客户提供服务。大地震该计划包含80多个基础设施项目,现已完成75%以上。截至12月中旬,SFPUC接近另一个里程碑,因为它准备就半岛管道地震升级工程的建设合同进行招标,这是作为供水系统改善计划一部分而进行的22个供水管道改善项目中的最后一个。预计将于四月开始施工。

著录项

  • 来源
    《Civil Engineering》 |2014年第1期|27-28|共2页
  • 作者

    JAY LANDERS;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号