Subway Station Reopened in Time For September 11 Anniversary

机译:地铁站按时于9月11日周年重新开放

获取原文
获取原文并翻译 | 示例
           

摘要

When the Metropolitan Transportation Authority of the State of New York (MTA) shuttered New York City's Cortlandt Street R Subway Station in 2005, the goal was to reopen it as soon as the work was complete. The work involved constructing an underpass to connect the station to the neighboring World Trade Center as part of a larger subway connectivity project. But when it was discovered that the station's southbound platform had settled as a result of nearby construction, the MTA pledged to have the station fully operational by September 11, 2011, the 10th anniversary of the terrorist attacks.
机译:当纽约州大都会运输管理局(MTA)在2005年关闭了纽约市的Cortlandt Street R地铁站时,目标是在工作完成后立即重新开放。这项工作涉及修建地下通道,将车站连接到邻近的世界贸易中心,这是一个较大的地铁连接项目的一部分。但是,当发现该站的南行平台因附近的建设而沉降时,MTA承诺在2011年9月11日(恐怖袭击10周年)之前使该站全面投入运营。

著录项

  • 来源
    《Civil Engineering》 |2012年第1期|p.27-29|共3页
  • 作者

    JENNY JONES;

  • 作者单位
  • 收录信息 美国《科学引文索引》(SCI);美国《工程索引》(EI);
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号