【24h】

Making gas pay

机译:加油

获取原文
获取原文并翻译 | 示例
           

摘要

Landfill may sit at the bottom of the waste hierarchy, but it still plays a large part in the disposal of waste. Of more than 500 landfill sites dotted around the UK- around five per county - 90 per cent produce renewable energy through landfill gas-capture technology. The installation and management of equipment involves complex lease and royalty arrangements that, typically, cover periods of up to 25 years. In theory, the relationship is a win-win situation - the energy company gains an income, the site makes a valuable contribution to the country's renewable energy portfolio, and the landfill owner benefits from a top-up payment.
机译:垃圾填埋场可能位于废物层级的底部,但在废物处置中仍然发挥着很大的作用。在英国分布的500多个垃圾填埋场中,每个县约有5个,其中90%通过垃圾填埋气捕获技术生产可再生能源。设备的安装和管理涉及复杂的租赁和特许权使用费安排,通常期限最长为25年。从理论上讲,这种关系是双赢的:能源公司获得收入,工厂为该国的可再生能源组合做出了宝贵的贡献,而垃圾填埋场的所有者则受益于充值付款。

著录项

  • 来源
    《Wastes Management》 |2019年第4期|27-28|共2页
  • 作者

    Travis Benn;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号