Biomass plant engineers aim to use the most efficient technology to maximise power production and plant reliability. They also need to use the best available techniques when designing, for example, the flue gas treatment (FGT) system; and critically some flexibility is required to accommodate changing feedstock and future regulatory conditions that will demand even lower emission limit values (ELVs). These are some of the issues addressed in the design process and they have a fundamental influence on the type, chemistry and volume of residues, as well as a significant impact on the business case. The plant layout and site design needs to accommodate biomass delivery and storage. It also needs to allow smooth delivery and offloading of reagents, as well as loading and removal of residues at any time of the day or night, subject to planning constraints. So the positioning of silos, provision of access routes, turning areas and sufficient headroom for bulk powder tankers is vital.
机译:生物量工厂的工程师旨在使用最高效的技术来最大化发电量和工厂可靠性。他们还需要在设计时使用最佳可行技术,例如,烟气处理(FGT)系统。至关重要的是,需要有一定的灵活性来适应不断变化的原料和未来的法规要求,这将要求甚至更低的排放限值(ELV)。这些是设计过程中要解决的一些问题,它们对残渣的类型,化学性质和数量具有根本影响,并且对业务案例有重大影响。工厂布局和场地设计需要适应生物质的输送和存储。在计划约束下,还需要允许试剂在白天或晚上的任何时间顺利输送和卸载,以及残留物的装载和清除。因此,筒仓的位置,进出通道的提供,转向区域以及散装粉料罐车的足够净空至关重要。

著录项

  • 来源
    《CIWM》 |2016年第10期|27-27|共1页
  • 作者

    Andrew Woolcock;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号