首页> 外文期刊>CIWM >LRR Remediation
【24h】

LRR Remediation

机译:LRR修复

获取原文
获取原文并翻译 | 示例
           

摘要

A development company wishes to develop a former metal works site that has traces of arsenic and other chemicals and requires the removal of post-tension concrete and foundations. The site is also extensively infested with Japanese Knotweed. The remediation costs are estimated at £750000, which represent sunk costs that will reduce the bottom line profit of the development. However, with a claim for LRR, the £750000 cost becomes a tax deduction of £1.125m (£750000 x 150 percent), providing a £315 000 saving for a 28 percent corporation tax payer.
机译:一家开发公司希望开发一个以前的金属工地,该工地具有砷和其他化学物质的痕迹,并且需要去除后张混凝土和地基。该站点还大量感染了日本虎杖。修复成本估计为750,000英镑,相当于沉没成本,这将减少开发的底线利润。但是,有了LRR索赔,750000英镑的成本就变成了112.5万英镑的税收减免(750000英镑x 150%),为28%的公司纳税人节省了315000英镑。

著录项

  • 来源
    《CIWM》 |2011年第6期|p.47|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号