首页> 外文期刊>CIWM >A Word From Our Sponsor: Ascot Environmental
【24h】

A Word From Our Sponsor: Ascot Environmental

机译:赞助商的话:Ascot Environmental

获取原文
获取原文并翻译 | 示例
           

摘要

The Recently-opened Scotgen Dargavel energy from waste facility can certainly lay claim to being the newest such facility in Europe. Just a few weeks into its operation it has already established itself as something of a demonstration plant, despite having had to overcome some significant hurdles along the way.rnThe site for the plant was not, in fact, specifically chosen by Ascot; rather we took over the interest in land that had already been granted planning permission for a pyrolysis technology that didn't come to fruition. This meant that while much of the legwork had been done, there was no chance of establishing the site in amongst ready-made customers... we had to go and find the customers and bring them to the site, making us the "chicken that laid the egg". In addition to the initial lack of customers, the site is also without a connection to the sewerage system, but these obstacles have been overcome and Scotgen Dargavel stands as a testament to the principle that if it is good enough, you will succeed.
机译:最近开放的来自废物设施的Scotgen Dargavel能源无疑可以声称是欧洲最新的此类设施。尽管运行过程中必须克服一些重大障碍,但距运营仅几周时间,它就已经成为示范工厂,实际上,Ascot并不是特别选择该工厂的地点。相反,我们接管了那些尚未获得批准的热解技术的规划许可土地。这意味着尽管已经完成了很多工作,但没有机会在现成的客户中建立站点……我们不得不去寻找客户并将他们带到站点,这使我们成为“下蛋”。除了最初缺少客户外,该站点还没有与下水道系统相关联,但是这些障碍已经克服,Scotgen Dargavel证明了只要足够好就可以成功的原则。

著录项

  • 来源
    《CIWM》 |2009年第9期|10-10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号