首页> 外文期刊>CoalTrans International >Siwertell unloader overhaul reduces turnaround time
【24h】

Siwertell unloader overhaul reduces turnaround time

机译:Siwertell卸船机大修减少了周转时间

获取原文
获取原文并翻译 | 示例
           

摘要

Global power company AES has completed the overhaul of two Siwertell ship unloaders at its coal-fired power plant in the Philippines. The turnkey project, started in 2008 at the 600MW Masinloc power plant, has had an immediate impact on turnaround times. "The owner now has two high-performing Siwertell unloaders, upgraded to the latest Siwertell design," says Cargotec supervisor, Stefan Lundqvist, who has been stationed in the Philippines during the project, and has worked closely alongside colleagues in Sweden and Thailand.
机译:全球电力公司AES已在其菲律宾的燃煤电厂完成了两个Siwertell卸船机的大修。总承包项目于2008年在600MW Masinloc电厂开始,对周转时间产生了直接影响。 Cargotec主管Stefan Lundqvist说:“业主现在拥有两台高性能的Siwertell卸货机,已升级为最新的Siwertell设计。”该项目期间一直驻在菲律宾,并与瑞典和泰国的同事密切合作。

著录项

  • 来源
    《CoalTrans International》 |2009年第5期|4|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号