How can 'tasks made ready' during lookahead planning impact reliable workflow and project duration?

机译:在提前计划中“准备好的任务”如何影响可靠的工作流程和项目持续时间?

获取原文
获取原文并翻译 | 示例
           

摘要

The goal of lookahead planning is to make a plan more realistic as construction tasks move closer to execution. To improve the reliability of lookahead planning, the construction industry has benefited from implementing the Last Planner~® System (LPS) which emphasizes improved workflow during construction. Lookahead planning involves transforming work that 'should be done' into work that 'can be done'. This is accomplished by breaking down activities into the level of operations, designing operations, and making tasks ready by removing task constraints. The purpose of this research is to study, through computer simulation, the relationship between improving tasks made ready (TMR) in lookahead planning and the reliability of weekly work planning expressed as percent plan complete (PPC) and their impact on project duration. Results show that a high TMR can result in a reduced project duration but the same cannot be said about PPC, making a case for TMR serving as a better indicator for project duration than PPC.
机译:超前计划的目的是使施工任务更接近执行,从而使计划更切合实际。为了提高前瞻性计划的可靠性,建筑行业受益于实施Last Planner〜®系统(LPS),该系统强调在施工过程中改善工作流程。提前计划涉及将“应完成”的工作转变为“可以完成”的工作。这是通过将活动划分为操作级别,设计操作并通过消除任务约束使任务准备就绪来实现的。这项研究的目的是通过计算机模拟研究在提前计划中改进现成任务(TMR)与以计划完成百分比(PPC)表示的每周工作计划的可靠性及其对项目工期的影响之间的关系。结果表明,较高的TMR可以缩短项目工期,但PPC不能说相同,这使得TMR可以比PPC更好地作为项目工期指标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号