...
首页> 外文期刊>Contract Journal >60 Seconds On Site
【24h】

60 Seconds On Site

机译:现场60秒

获取原文
获取原文并翻译 | 示例
           

摘要

What site are you working on at the moment? The NewTyne Crossing, a new road tunnel close to the existing Tyne Tunnel being built by Bouygues Travaux Publics. What is the best building site you have ever worked on and why? Probably this one. The site has such a wide range of construction techniques within a relatively small area. It keeps you interested every day. And the worst? The most challenging was a tailings dam in Tunisia, where I was working with a local contractor. We were both conversing in our second or third languages, definitely not a strong point for either of us.
机译:您目前在哪个网站上工作? NewTyne Crossing是一条新的公路隧道,靠近Bouygues Travaux Publics正在建造的现有Tyne隧道。您曾经从事过的最佳建筑工地是什么?为什么?大概这个。该场地在相对较小的区域内具有如此广泛的建筑技术。它使您每天都感兴趣。还有最坏的?最具挑战性的是突尼斯的尾矿坝,当时我正在与当地承包商合作。我们俩都在用第二种或第三种语言进行交流,这绝对不是我们双方的强项。

著录项

  • 来源
    《Contract Journal》 |2009年第6706期|p.28|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 建筑科学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号