【24h】

Cost and capability

机译:成本与能力

获取原文
获取原文并翻译 | 示例
           

摘要

The growth of Contracting for Availability (CFA) agreements within MoD procurement is widening the involvement of contractor logistical support to the extent that suppliers are now taking on not only the through life maintenance of the equipment they sell, but also the day-to-day management of the asset.rnThe concept derives from the US Department of Defense's Performance-Based Logistics initiative, introduced in the 1990s, with the aims of cutting the size of the services' logistics chains, reducing their costs and investing the money saved into the front line.
机译:国防部采购中的可用性合同(CFA)协议的增长正在扩大承包商后勤支持的范围,以至于供应商现在不仅承担所售设备的终生维护,而且还承担日常工作该概念源自于1990年代美国国防部基于绩效的物流计划,旨在削减服务物流链的规模,降低其成本并将节省的资金投资到前线线。

著录项

  • 来源
    《Defence management journal》 |2010年第48期|p.40|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号