首页> 外文期刊>Engineering Technology and Applied Science Research >Environmental Risk Assessment and Management in Oil Platform Construction Phase Activities: A Case Study
【24h】

Environmental Risk Assessment and Management in Oil Platform Construction Phase Activities: A Case Study

机译:石油平台建设阶段活动的环境风险评估与管理:案例研究

获取原文
           

摘要

The construction phase is one of the very risky stages engaged in oilfields, which usually involves minor to severe human, financial, and environmental damages. It includes a major part of lost working times, and in recent years, along with the development of oilfields and oil platform construction activities in Iran, hazardous risks and events have occurred and have been recorded. Therefore, this study aims to reduce the negative effects of the risks engaged in oil platform construction activities in the region under study, i.e. the Abuzar oilfield. The indexing system method, along with determining the importance index, effect, and frequency of occurrence, was used in this study to evaluate the environmental risks of oil platform construction activities in Abuzar oilfield. First, the project activities were identified and then, the effect of desired activities on environmental aspects (water, air, soil, human, waste production, and noise) was investigated. For quantitative estimation of risk values through interviewing the experts and using the tables of intensity, effect, and frequency of event occurrence, were calculated based on the formula governing the effect of different activities on the environment, and the risk value was determined. The research findings indicated that most of the environmental risks are in the range of average risks (72.9%) however 20.2% are in the range of low risks and 6.9% are in the range of high risks. Finally, considering experts’ viewpoints, management solutions were proposed to reduce the risk of activities, and the risk priority numbers were calculated after performing the corrective actions.
机译:建造阶段是在油田中进行的极高风险阶段之一,通常涉及轻度至严重的人为,财务和环境破坏。它包括工作时间损失的主要部分,近年来,随着伊朗油田的发展和石油平台建设活动的发展,已经发生并记录了危险风险和事件。因此,本研究旨在减少所研究区域(即阿布扎尔油田)从事石油平台建设活动的风险的负面影响。本研究使用索引系统方法,以及确定重要性指标,影响和发生的频率,来评估阿布扎尔油田石油平台建设活动的环境风险。首先,确定项目活动,然后研究所需活动对环境方面(水,空气,土壤,人类,废物产生和噪声)的影响。为了通过与专家面谈并使用强度,效应和事件发生的频率表来定量评估风险值,根据控制不同活动对环境的影响的公式来计算,并确定了风险值。研究结果表明,大多数环境风险处于平均风险范围内(72.9%),而20.2%处于低风险范围内,而6.9%处于高风险范围内。最后,考虑到专家的观点,提出了降低活动风险的管理解决方案,并在执行纠正措施后计算了风险优先级数。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号