...
首页> 外文期刊>Journal of Energy Technologies and Policy >Optimal Generation Scheduling of Hydropower Plant with Pumped Storage Unit
【24h】

Optimal Generation Scheduling of Hydropower Plant with Pumped Storage Unit

机译:带抽水蓄能机组的水力发电优化调度

获取原文
           

摘要

The generation scheduling problem of hydropower plant in the presence of pumped storage unit is complex. This work has proposed a solution strategy to determine the optimum generation based on the analysis of hourly and annual generation costs. The hourly and annual costs are linear functions of power output and energy generation, respectively. The power output was formulated as a linear function of hydraulic head and discharge rate, without computing the conversion efficiency from a hill diagram. The mathematical relationships between power, hydraulic head, and discharge rate can be determined from loading & efficiency test data and validated by using a field test. The optimum generation was stated as capacity factor and varied with water drawdown of the plant. The optimum time interval and duration of the pumped storage unit can be determined by analyzing the hourly marginal operating costs, simplified by using a composite cost function. The proposed strategy has been simulated with the generation data of the Bhumibol hydropower plant. Keywords: generation scheduling, hydropower plant, pumped storage
机译:在存在抽水蓄能机组的情况下水电站的发电调度问题是复杂的。这项工作提出了一种基于小时和年度发电成本分析来确定最佳发电量的解决方案策略。每小时成本和年度成本分别是功率输出和能量产生的线性函数。功率输出被公式化为液压扬程和排量的线性函数,而无需从山图计算转换效率。功率,液压扬程和排出速率之间的数学关系可以根据负载和效率测试数据确定,并可以通过现场测试进行验证。最佳发电量表示为容量因子,随工厂用水量的变化而变化。抽水式存储单元的最佳时间间隔和持续时间可以通过分析每小时边际运营成本来确定,并通过使用复合成本函数来简化。普密蓬水电站的发电数据对拟议的策略进行了仿真。关键词:发电调度,水力发电厂,抽水蓄能

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号