...
首页> 外文期刊>Journal of Water Resource and Hydraulic Engineering >Prioritization of Municipal Water Mains Leakages for the Selection of R&R Maintenance Strategies Using Risk Based Multi-Criteria FAHP Model
【24h】

Prioritization of Municipal Water Mains Leakages for the Selection of R&R Maintenance Strategies Using Risk Based Multi-Criteria FAHP Model

机译:使用基于风险的多准则FAHP模型,优先选择市政供水管道泄漏,以选择R&R维护策略

获取原文
           

摘要

Municipal water network systems are composed of a wide range of complex buried infrastructure. Many of these essential infrastructures have reached or exceeded their design life cycle and need a sound rehabilitation and replacement (R&R) Maintenance Strategies. However, maintaining and repairing such an aging and complex water pipeline network systems in big urban cities presents a unique decision and management challenges for water utility companies with respect to how to carry out the ranking and evaluation process and decide which of these complex wide ranges of buried infrastructure from the networks required replacement or rehabilitation in a cost-effective manner. These decision and management challenges of maintaining water distribution pipeline network infrastructures at nearly the intended design condition by investing the minimum amount of money, and allocating limited resources utility companies have among different projects kept the water utility companies actively searching for innovative approaches for decision support methodologies based on analysis of options, that involves evaluation of many criteria and parameters in order to determine the optimal maintenance strategies.This paper presents how risk based Fuzzy Analytic Hierarchy Process (FAHP) decision approach can be used to rank existing or recently detected multiple leakages form WD pipeline networks. It also demonstrate how this method can benefit the decision making process for the selection of which pipeline required urgent action, and prioritize the optimal alternative rehabilitation and replacement (R&R) Maintenance Strategies by integrating value professional judgments and stakeholder preferences with limited annual budget the water utility companies may have. In conclusion, this FAHP approach would benefit the decision-makers of water utility companies where there are currently no structured approach or methods for making a responsible and defendable decision with clearly demonstrated trade-offs between stakeholder investment and water utility agencies service levels standards and objectives.
机译:市政供水网络系统由各种复杂的地下基础设施组成。这些重要的基础架构中有许多已经达到或超过了其设计生命周期,因此需要完善的修复和替换(R&R)维护策略。但是,在大城市中维护和修复这种老化和复杂的供水管网系统,对于水务公司而言,在如何进行排名和评估过程以及确定这些复杂的水处理范围中的哪一个方面提出了独特的决策和管理挑战。网络中的地下基础设施需要以经济有效的方式进行更换或修复。这些决策和管理挑战是通过投资最少的钱来维持配水管网基础设施接近预期的设计条件,并在不同的项目之间分配有限的资源公用事业公司,这些使公用事业公司积极寻找决策支持方法的创新方法基于选项的分析,其中涉及评估许多标准和参数,以确定最佳的维护策略。本文介绍了如何基于风险的模糊层次分析法(FAHP)决策方法可以对现有或最近发现的多种泄漏形式进行排序WD管道网络。它还展示了该方法如何使决策过程中选择哪个管道需要采取紧急措施的方法受益,并通过将价值专业判断和利益相关者的偏好与有限的年度预算相结合来优先考虑最优的替代修复和更换(R&R)维护策略。公司可能有。总之,这种FAHP方法将使水务公司的决策者受益,因为他们目前没有结构化的方法或方法来做出负责任且可辩护的决策,并且在利益相关者投资与水务机构的服务水平标准和目标之间进行了明确的权衡。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号