...
首页> 外文期刊>International Journal of Engineering Research and Applications >Future Water Demand of Gaziantep Province Using Population Forecasting Method
【24h】

Future Water Demand of Gaziantep Province Using Population Forecasting Method

机译:基于人口预测方法的加济安泰普省未来需水量

获取原文
           

摘要

Population projections are necessary to estimate the future population by following the trend (increase) line. Population projections are significant for managing and planning the research area. This study aims to examine the water need and water consumption of Gaziantep province. In order to determine the future population of Gaziantep city, ?lbank method was utilized in the calculations. Düzba? Dam which is considered to supply drinking water to Gaziantep is not sufficient for close future and in order to supply water to city it is estimated that there will be need for new water resources. Therefore, state corporation should take required precautions.
机译:通过遵循趋势(增加)线来估算未来的人口是必需的。人口预测对于管理和规划研究区域非常重要。本研究旨在检验加济安泰普省的用水需求和用水量。为了确定加济安泰普市的未来人口,在计算中采用了lbank方法。杜兹巴?大坝被认为是向加济安泰普(Gaziantep)供应饮用水的水库,在不久的将来还远远不够,为了向城市供水,估计将需要新的水资源。因此,国营公司应采取必要的预防措施。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号