Optimization of Time Restriction in Construction Project Management Using Lingo and M.S.Excel

机译:使用Lingo和M.S.Excel优化建设项目管理中的时间限制

获取原文
           

摘要

This study is an attempt to identify the minimum time of a construction project using the critical path method and linear programming model. A systematic analysis is attempted by developing a work breakdown structure for entire project to establish work elements for quantifying various resources against time and cost. A network is established taking into consideration all the predecessor and successor activities. The network is then optimized through crashing of activities so as to obtain optimal solution and serves as a base for optimizing total project cost. Finally, linear programming model is used to formulate the system of crashing network for minimum time by LINGO model and Microsoft Excel. These models consider many considerations of project thus reducing the duration of project. Ultimately, comparison of both the software outputs and the manual
机译:这项研究是尝试使用关键路径法和线性规划模型来确定建设项目的最短时间。通过为整个项目开发工作分解结构来尝试进行系统分析,以建立工作元素以根据时间和成本量化各种资源。建立网络时要考虑所有前任和后继活动。然后,通过活动崩溃来优化网络,以获得最佳解决方案,并作为优化项目总成本的基础。最后,使用线性规划模型通过LINGO模型和Microsoft Excel来建立最短时间的崩溃网络系统。这些模型考虑了项目的许多考虑因素,从而减少了项目的持续时间。最终,比较软件输出和手册

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号