...
首页> 外文期刊>Advances in civil engineering >The Integrated Hydropower Sustainability Assessment in Tajikistan: A Case Study of Rogun Hydropower Plant
【24h】

The Integrated Hydropower Sustainability Assessment in Tajikistan: A Case Study of Rogun Hydropower Plant

机译:塔吉克斯坦综合水电可持续发展评估:罗云水电站案例研究

获取原文
           

摘要

Tajikistan has formulated the strategy to rejuvenate the country through hydropower. The Rogun hydropower plant (HPP) is designed as the highest hydropower station, while its sustainability is also questioned due to a lack of comprehensive sustainability evaluation. Considering that the external environment of Rogun HPP is complex and changeable, its sustainable performance will be fragile and inconstant. To comprehensively assess the sustainable performance, an integrated evaluation framework, covering the current and dynamic sustainable performance, is urgently established. Therefore, this paper firstly explored the hydropower sustainability assessment indicators which can conform to Tajikistan’s situations and further examined the current sustainable performance of Rogun HPP. The case study found that Rogun HPP’s current financial viability, involuntary resettlement, the measures to prevent corruption, and information disclosure were seriously deficient. The SWOT analysis indicated the external factors, such as the Belt and Road Initiative, improving business environment, and easing geopolitical disputes, can eliminate weaknesses and improve the sustainable performance of Rogun HPP. At the same time, tight fiscal allocations and economic downturns will have negative influences on the sustainable performance. The integrated evaluation tool established in this paper can not only evaluate the current sustainable performance but also consider the impact of external factors on sustainable performance from a dynamic perspective. This paper contributes to the current knowledge system by establishing the hydropower sustainability assessment system which is suitable for Tajikistan’s conditions. Moreover, the results are informative for the decision-makers to have a better understanding of Rogun HPP’s current strengths and weaknesses, valuable opportunities, and potential threats.
机译:塔吉克斯坦制定了通过水电将国家恢复活力的战略。 Rogun水电站(HPP)设计为最高水电站,而其可持续性也因缺乏综合可持续性评估而质疑。考虑到Rogun HPP的外部环境复杂而变得可变,其可持续性表现将是脆弱和不变的。为了全面评估可持续绩效,迫切地建立了覆盖了综合评价框架,涵盖了当前和动态可持续性绩效。因此,本文首先探讨了水电可持续发展评估指标,可以符合塔吉克斯坦的情况,并进一步审查了罗云HPP的目前可持续业绩。案例研究发现,Rogun HPP目前的金融活力,非自愿移民安置,防止腐败的措施以及信息披露严重缺乏。 SWOT分析表明了外部因素,如皮带和道路倡议,改善商业环境,宽松地缘政治纠纷,可以消除缺点,提高罗云HPP的可持续性能。与此同时,严格的财政拨款和经济衰退将对可持续业绩产生负面影响。本文建立的综合评估工具不仅可以评估目前的可持续业绩,还可以考虑外部因素对动态视角的可持续业绩的影响。本文通过建立适合塔吉克斯坦条件的水电可持续发展系统,有助于目前的知识系统。此外,结果对决策者提供了更好地了解Rogun HPP当前优势和劣势,宝贵的机会和潜在威胁。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号