...
首页> 外文期刊>ScientificWorldJournal >Key Techniques and Risk Management for the Application of the Pile-Beam-Arch (PBA) Excavation Method: A Case Study of the Zhongjie Subway Station
【24h】

Key Techniques and Risk Management for the Application of the Pile-Beam-Arch (PBA) Excavation Method: A Case Study of the Zhongjie Subway Station

机译:桩梁拱(PBA)挖掘方法应用关键技术与风险管理 - 以中街地铁站为例

获取原文
           

摘要

The design and construction of shallow-buried tunnels in densely populated urban areas involve many challenges. The ground movements induced by tunneling effects pose potential risks to infrastructure such as surface buildings, pipelines, and roads. In this paper, a case study of the Zhongjie subway station located in Shenyang, China, is examined to investigate the key construction techniques and the influence of the Pile-Beam-Arch (PBA) excavation method on the surrounding environment. This case study discusses the primary risk factors affecting the environmental safety and summarizes the corresponding risk mitigation measures and key techniques for subway station construction using the PBA excavation method in a densely populated urban area.
机译:密集城市地区浅埋隧道的设计和施工涉及许多挑战。隧道效应引起的地面运动对基础设施,管道,管道和道路等基础设施构成潜在风险。本文采用了位于中国沉阳的中街地铁站的案例研究,研究了桩梁拱(PBA)挖掘方法对周围环境的关键施工技术及影响。本案例研究讨论了影响环境安全的主要风险因素,并总结了使用PBA挖掘方法在浓密人口稠密的城市地区的地铁站施工的相应风险缓解措施和关键技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号