Geomagnetic Disturbance: A comprehensive approach by American Electric Power to address the impacts.

机译:地磁扰动:美国电力公司为解决这些影响而采取的综合方法。

获取原文
获取原文并翻译 | 示例
           

摘要

American Electric Power (AEP), one of the largest electric utilities in the United States, operates the nation?s largest electricity transmission system with a nearly 40,000-mi network in 11 states, connecting more than 5,000 substations, among which more than 800 are 138 kV and above. Per the recently approved North American Electric Reliability Corporation (NERC) geomagnetic disturbance (GMD) standards EOP-010-1?Geomagnetic Disturbance Operations and TPL-007?Transmission System Planned Performance During Geomagnetic Disturbances, AEP?being the owner and operator of the bulk-power system?would be required to develop GMD operating procedures and conduct initial and ongoing assessments on potential impacts of benchmark GMD events on bulk-power system equipment, especially extra-high-voltage (EHV) transformers, and the bulk-power system as a whole. Based on these assessments, it is also required to prepare a plan (if necessary) to mitigate any GMD impacts. This article describes AEP?s comprehensive approach and efforts on GMD monitoring, modeling, and mitigation to ensure reliable performance of its critical transmission network and assets.
机译:美国最大的电力公司之一美国电力(AEP)运营着美国最大的电力传输系统,在11个州拥有近40,000英里的网络,连接5,000多个变电站,其中800多个变电站138 kV及以上。根据最近批准的北美电力可靠性公司(NERC)地磁干扰(GMD)标准EOP-010-1“地磁干扰操作”和TPL-007“地磁干扰期间传输系统的计划性能”,AEP是大批货物的所有者和运营商电力系统?将需要制定GMD操作程序,并对基准GMD事件对大功率电力系统设备(尤其是超高压(EHV)变压器)和大功率电力系统的潜在影响进行初步和持续的评估。整个。根据这些评估,还需要准备一个计划(如有必要)以减轻任何GMD影响。本文介绍了AEP在GMD监视,建模和缓解方面的综合方法和工作,以确保其关键传输网络和资产的可靠性能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号