首页> 外文期刊>Energy Conversion & Management >Design of a combined heating, cooling and power system: Sizing, operation strategy selection and parametric analysis
【24h】

Design of a combined heating, cooling and power system: Sizing, operation strategy selection and parametric analysis

机译:供热,制冷和动力系统组合的设计:选型,运行策略选择和参数分析

获取原文
获取原文并翻译 | 示例
       

摘要

This work addresses the problem of optimal design of trigeneration plants and discusses the factors that affect the operation and the feasibility of investment. The effect of various operation parameters and energy tariffs structures are studied and the performance of a trigeneration plant is presented and evaluated versus the investment size. A new operation strategy is being introduced and examined along with three existing strategies. The results incorporate various economical and performance indices that characterize the system, with reference to a case of a commercial hospital building.
机译:这项工作解决了三代发电厂的优化设计问题,并讨论了影响运营的因素和投资的可行性。研究了各种运行参数和电价结构的影响,并提出了三代发电厂的性能,并对投资规模进行了评估。一种新的操作策略正在被引入并与三种现有策略一起进行研究。该结果结合了商业医院建筑物的情况,综合了表征该系统的各种经济和性能指标。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号