首页> 外文期刊>Environment reporter >Court Rejects Illinois, Michigan Challenges To Tariff Scheme for Power Grid Upgrades
【24h】

Court Rejects Illinois, Michigan Challenges To Tariff Scheme for Power Grid Upgrades

机译:法院拒绝密歇根州伊利诺伊州对电网升级电价计划提出质疑

获取原文
获取原文并翻译 | 示例
           

摘要

In a decision being heralded as a clean energy infrastructure milestone, federal appeals court rejected challenges brought by Illinois and Michigan to a Midwest Independent System Operator (MISO) scheme to share the cost of high-voltage transmission upgrades across several states (Illinois Commerce Commission v. FERC, 7th Cir., No. 11-3421, 6/7/13). In a June 7 decision, the U.S. Court of Appeals for the Seventh Circuit affirmed a 2011 plan by MISO to allocate costs to 12 Midwestern states for high-voltage transmission lines, also known as "multi-value projects."
机译:在一项被宣布为清洁能源基础设施里程碑的决定中,联邦上诉法院驳回了伊利诺伊州和密歇根州向中西部独立系统运营商(MISO)计划提出的挑战,以在多个州之间分担高压输电升级的费用(伊利诺伊州商务委员会v FERC,第7卷,编号11-3421,6 / 7/13)。在7月7日的判决中,美国第七巡回上诉法院确认了MISO在2011年的一项计划,该计划将成本分配给中西部12个州的高压输电线路,也就是“多价值项目”。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号