...
【24h】

BNWAS deadline looms

机译:BNWAS截止日期迫在眉睫

获取原文
获取原文并翻译 | 示例
           

摘要

Next July sees the first of four deadlines under which owners of vessels will have to install a bridge navigational watch alarm system (BNWAS). The 1 July 2011 date applies only to newly built cargo ships of over 150gt and newbuild passenger ships of any size that are subject to SOLAS. BNWASs are the IMO's answer to preventing incidents such as groundings and collisions involving ships where the sole OOW has been distracted or incapacitated for one reason or another. Although the rule providing for mandatory installation was only adopted in 2009, the performance standards were laid down in the 2002 document MSC.128(75).
机译:明年7月是四个最后期限中的第一个期限,根据该期限,船主将必须安装驾驶室航行值班警报系统(BNWAS)。 2011年7月1日这一日期仅适用于150总吨以上的新建货船和受SOLAS管制的任何尺寸的新建客船。 BNWAS是国际海事组织(IMO)的预防措施,可防止因唯一的OOW因某种原因而分散注意力或使之丧失工作能力的船舶遭受地面和碰撞等事件。尽管规定强制安装的规则仅在2009年采用,但性能标准已在2002年文件MSC.128(75)中制定。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号