...
首页> 外文期刊>Fairplay >End of the order famine?
【24h】

End of the order famine?

机译:饥荒结束了吗?

获取原文
获取原文并翻译 | 示例
           

摘要

Last week, Daewoo Shipbuilding & Marine Engineering (DSME) won its first newbuilding order for almost a year, although the contract is unlikely to set the world on fire.The new order, for a 19,100dwt barge for use in the deployment of offshore structures was placed by Netherlands-based offshore contractor Heerema Marine. This should be encouraging news for an industry where new business in the past few months has been more or less nil. DSME last received an order back in August 2008 when Kuwait Oil Tanker Co contracted for a VLCC quartet. Of Daewoo's compatriot shipyards, Samsung Hi's last order was received in November 2008 (for a pair of drilling ships) while none of the Hyundai group shipyards has signed a new-building contract since September.
机译:上周,大宇造船与海洋工程公司(DSME)获得了近一年来的第一笔新造船订单,尽管该合同不太可能引起世界的关注,新订单是一艘19,100载重吨的驳船,用于部署近海结构由荷兰的离岸承包商Heerema Marine安置。对于过去几个月来几乎没有新业务的行业来说,这应该是令人鼓舞的消息。 DSME上一次收到订单是在2008年8月,当时科威特油轮公司​​与VLCC四方承包了合同。在大宇的同胞船厂中,Samsung Hi的最新订单是在2008年11月收到的(用于一艘钻探船),而现代集团的船厂自9月以来都没有签订新船合同。

著录项

  • 来源
    《Fairplay》 |2009年第6535期|34-35|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号