首页> 外文期刊>Felsbau >Karahnjukar Hydroelectric Plant: Headrace Tunnel Excavation by Tunnel Boring Machines Through Fault Zones
【24h】

Karahnjukar Hydroelectric Plant: Headrace Tunnel Excavation by Tunnel Boring Machines Through Fault Zones

机译:Karahnjukar水力发电厂:隧道掘进机通过断层带开挖头弯隧道

获取原文
获取原文并翻译 | 示例
           

摘要

The headrace tunnel for the Karahnjukar hydroelectric plant is almost 40 km in length of which 35.5 km are being excavated by three hard rock TBM. The rock mass consists of gently inclined basalt lava flows with intercalated layers of sedimentary rocks as well as Moberg Formations. Several fault zones, weak sediment and scoria layers and high ground water inflows have negatively affected the progress of the TBMs and required comprehensive and time consuming measures to overcome these problems.%Der Triebwasser Stollen fur das Wasserkraftwerk Kärahnjükar ist annähernd 40 km lang, von denen 35,5 km mit Hartgestelnstunnelbohrmaschinen aufgefahren werden. Die Gesteinsverhältnisse bestehen aus schwach einfallenden Basaltlavadecken mit eingeschalteten Lagen von Sedimentgesteinen und Moberg Formationen. Verschiedene Störungszonen, weichere Sediment- und Schlackenlagen sowie hohe Grundwassereinßüsse haben den Vortrieb der Bohrmaschinen beeinträchtigt und erforderten aufwändige und zeitraubende Abhilfemaßnahmen.
机译:Karahnjukar水电站的引水隧洞长近40公里,其中35.5公里是由三个硬岩TBM开挖的。岩体由缓倾斜的玄武岩熔岩流和沉积岩层以及Moberg地层组成。几个断层带,薄弱的沉积物和火山灰层以及大量的地下水涌入对隧道掘进机的进展产生了负面影响,需要采取综合,费时的措施来克服这些问题。使用硬框隧道掘进机35.5公里。岩石条件包括低沉的玄武岩熔岩天花板,沉积岩和莫贝格地层的活化层。各种断层带,较软的沉积物和矿渣层以及大量的地下水进入都会损害钻机的前进,并需要采取复杂而费时的补救措施。

著录项

  • 来源
    《Felsbau》 |2006年第5期|p.71-75|共5页
  • 作者单位

    Landsvirkjun, The National Icelandic Power Company, Haaleitisbraut 68, Reykjavik, Iceland;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 地质学;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号