【24h】

MAINTENANCE MATTERS

机译:保养事项

获取原文
获取原文并翻译 | 示例
           

摘要

A KC-135's left and right outboard aileron lockout gearbox assemblies were improperly installed during programmed depot maintenance (PDM), resulting in damage to both gearbox assemblies and structural support casting during aileron rigging. Worker 1 (W1) was tasked with the removal and replacement of both the left and right wing outboard aileron lockout gearboxes on the PDM input aircraft. Replacement of outboard aileron gearbox assemblies is a non-routine job during PDM. Typically, the assemblies are inspected and left intact on the aircraft unless found to be defective. In this case, the gearboxes were scheduled for replacement due to excessive leakage. W1 was certified on this task, but because of its infrequent nature, had not accomplished it recently.
机译:在程序化仓库维护(PDM)期间,未正确安装KC-135的左右舷外副翼锁定变速箱组件,从而在副翼装配期间损坏了变速箱组件和结构支撑件。工人1(W1)的任务是拆卸和更换PDM输入飞机上的左翼和右翼舷外副翼锁定变速箱。在PDM期间,更换副翼副变速箱组件是一项非常规工作。通常,除非发现有缺陷,否则对组件进行检查并将其完整地放在飞机上。在这种情况下,变速箱由于泄漏过多而被安排更换。 W1已通过此任务的认证,但是由于其不经常发生的性质,最近尚未完成。

著录项

  • 来源
    《Flying safety magazine》 |2005年第8期|p.28-29|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 航空;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号