首页> 外文期刊>Ground water >'Estimation of the Height of Complete Groundwater Drainage above Mined Longwall Panels'
【24h】

'Estimation of the Height of Complete Groundwater Drainage above Mined Longwall Panels'

机译:“估算开采的长壁面板上方完全排水的高度”

获取原文
获取原文并翻译 | 示例
           

摘要

I thank Pells (2014) for the comments on my paper. This reply responds to the comments in the same order as they appear in that commentary. The statement in Tammetta (2013), quoted by Pells (2014), refers to complete drainage of groundwater initially in storage in the collapsed zone, and the continued drainage of free water entering the collapsed zone from the disturbed zone.
机译:我感谢佩尔斯(2014)对我论文的评论。此回复以与评论中出现的顺序相同的顺序回复评论。 Pells(2014)引用了Tammetta(2013)中的说法,指的是最初存储在塌陷区中的地下水完全排干,以及继续从扰动区进入塌陷区的自由水继续排干。

著录项

  • 来源
    《Ground water》 |2014年第3期|339-342|共4页
  • 作者

    P. Tammetta;

  • 作者单位

    Coffey Geotechnics Pty Ltd, Tower B, 799 Pacific Highway, Chatswood, NSW 2067, Australia;

  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号