...
首页> 外文期刊>Hydro Review Worldwide >Rehab to proceed on pair of Nigerian projects
【24h】

Rehab to proceed on pair of Nigerian projects

机译:进行尼日利亚项目复修

获取原文
获取原文并翻译 | 示例
           

摘要

JSC RusHydro has signed a deal that will see the Russian energy conglomerate manage and modernize the 760 MW Kainji and 578 MW Jebba plants in Nigeria — both of which have suffered from decades of neglect. The five-year agreement - signed by a consortium comprised of RusHydro subsidiary RusHydro International AG and Mainstream Energy Solutions Ltd. of Nigeria - follows efforts by owner Power Holding Company of Nigeria (PHCN) to revive the plants over the past several years.
机译:JSC RusHydro已签署协议,将看到俄罗斯能源集团对尼日利亚的760 MW Kainji和578 MW Jebba电厂进行管理和现代化改造,这两家工厂都遭受了数十年的忽视。这项为期五年的协议是由RusHydro的子公司RusHydro International AG和尼日利亚的Mainstream Energy Solutions Ltd.组成的财团签署的,该协议是在尼日利亚所有者Power Holding Company(PHCN)在过去几年中恢复电厂的努力之后做出的。

著录项

  • 来源
    《Hydro Review Worldwide》 |2013年第4期|68|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号