首页> 外文期刊>Hydro Review Worldwide >ADB to support rehab of Tajikistan's 240 MW Golovnaya
【24h】

ADB to support rehab of Tajikistan's 240 MW Golovnaya

机译:然后亚行对Tajiks 240 MV Head的支持进行修复

获取原文
获取原文并翻译 | 示例
           

摘要

The Asian Development Bank (ADB) has reportedly signed a memorandum of understanding with the Tajik government to help finance rehabilitation of the 240 MW Golovnaya hydro-power plant. Located on the Vakhsh River, Golovnaya was first commissioned in 1962. The plant would be the Tajikstan's largest if it were operating at its full designed capacity, but with a current capacity of 120 MW, it now trails the country's 126 MW Kayrakkum. Officials said the rehabilitation should increase Golovnaya's capacity to 252 MW while extending its life by 50 years.
机译:据报道,亚洲开发银行(ADB)已与塔吉克斯坦政府签署了一项谅解备忘录,以为240兆瓦Golovnaya水电站的修复提供资金。 Golovnaya位于瓦赫什河上,于1962年首次投入运营。如果以其全部设计产能运行,该厂将是塔吉克斯坦最大的电厂,但目前装机容量为120兆瓦,现在已经落后于该国的126兆瓦Kayrakkum。官员们说,修复工作应将Golovnaya的容量提高到252兆瓦,同时将其寿命延长50年。

著录项

  • 来源
    《Hydro Review Worldwide》 |2013年第6期|10-10|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号