Environmental Mitigation: Lessons Learned at Kali Gandaki A

机译:减轻环境影响:卡利·甘达基A的经验教训

获取原文
获取原文并翻译 | 示例
           

摘要

To ensure local acceptance of the 144-mw Kali Gandaki A hydroelectric project, the government of Nepal prepared a comprehensive environmental mitigation package. The experiences at Kali Gandaki A — which began operating in August 2002 ―provide valuable lessons about what does and does not work. Hydro project developers make extensive efforts to integrate environmental impact assessments, along with mitigation and enhancement measures, into project design and implementation. The focus on this work is high in recent years, as concern grows about the effects of new projects. During construction of the Kali Gandaki A hydro project in western Nepal, developers learned what mitigation measures did and did not work, leading to a greater understanding for future hydro projects.
机译:为确保144兆瓦的Kali Gandaki A水电项目在当地得到接受,尼泊尔政府准备了全面的环境缓解计划。 2002年8月开始运营的Kali Gandaki A的经验提供了关于什么有效和无效的宝贵经验教训。水电项目开发商做出了巨大的努力,将环境影响评估以及缓解和改善措施整合到项目设计和实施中。近年来,随着人们对新项目的影响越来越关注,对这项工作的关注度很高。在尼泊尔西部的Kali Gandaki A水电项目建设过程中,开发商了解到缓解措施有效和无效的原因,从而使人们对未来的水电项目有了更深入的了解。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号